Cedar Creek Biofuels Project
Minnesota PROJECTS
USGS IN YOUR STATE
USGS Water Science Centers are located in each state.
|
Cedar Creek Lab Work:
Using the drill rig to install unsaturated zone fluxmeters.
Collecting corn samples.
Collecting corn samples.
Digging trenches for installation of soil monitoring equipment.
Installation of soil monitoring equipment.
Documenting the vertical soil profile.
Preparing the soil for installation of soil monitoring equipment.
Preparing soil for installation of continuous soil moisture and temperature monitors.
Planting corn at the field site.
Prepping a plot for planting corn.
Sampling groundwater from a research plot.
Soil sampling the research plots following contaminant and tracer application.
Collecting prairie vegetation using hand clippers.
|