05288600 - RICE CREEK AT UNIVERSITY AVE. IN FRIDLEY, MN Streamflow potentially affected by regulation1 - No Location.-- latitude 45o05'30" longtitude 93o15'47" Measure number Date Time Discharge, in ft^3;/s Base Flow2 1 1969-03-18 12:45 63.1 Not Determined 2 1969-03-25 12:45 136.0 Not Determined 3 1969-04-10 15:30 205.0 Not Determined 4 1969-06-06 16:35 30.8 Not Determined 5 1969-07-23 17:55 11.3 Not Determined 6 1969-10-27 10:35 3.63 Not Determined 7 1969-12-04 13:55 9.63 Not Determined 8 1970-01-12 14:30 10.6 Not Determined 9 1970-02-24 9:10 7.31 Not Determined 10 1970-04-02 8:45 16.3 Not Determined 11 1970-05-08 9:10 47.6 Not Determined 12 1970-06-05 10:45 28.0 Not Determined 13 1970-07-08 8:50 5.11 Not Determined 14 1970-08-11 9:25 7.32 Not Determined 15 1970-09-17 9:25 12.5 Not Determined 16 1970-10-20 8:50 21.5 Not Determined 17 1970-11-10 13:00 203.0 Not Determined 18 1970-12-21 9:50 83.9 Not Determined 19 1971-01-29 10:05 14.5 Not Determined 20 1971-02-24 11:30 18.8 Not Determined 21 1971-03-30 9:35 96.6 Not Determined 22 1971-04-29 9:40 147.0 Not Determined 23 1971-06-03 9:15 88.1 Not Determined 24 1971-07-21 9:45 40.3 Not Determined 25 1971-08-06 16:10 28.1 Not Determined 26 1971-09-16 9:35 16.1 Not Determined 27 1971-10-12 15:05 17.9 Not Determined 28 1971-11-10 9:45 50.4 Not Determined 29 1971-12-21 9:15 34.0 Not Determined 30 1972-01-11 9:45 25.9 Not Determined 31 1972-02-16 10:40 Not Determined 32 1972-10-18 8:30 21.5 Not Determined 33 1972-11-24 9:55 56.5 Not Determined 34 1972-12-14 13:30 25.6 Not Determined 35 1973-01-17 10:00 14.2 Not Determined 36 1973-02-13 9:55 10.3 Not Determined 37 1973-03-16 10:00 138.0 Not Determined 38 1973-04-11 8:55 135.0 Not Determined 39 1973-05-11 10:05 95.0 Not Determined 40 1973-07-03 8:40 56.0 Not Determined 41 1973-08-01 12:05 20.7 Not Determined 42 1973-08-31 10:35 8.21 Not Determined 43 1973-10-19 9:25 19.3 Not Determined 44 1973-11-12 13:05 14.3 Not Determined 45 1973-12-10 14:13 27.9 Not Determined 46 1974-01-11 Not Available 6.0 Not Determined 47 1974-02-21 12:15 14.9 Not Determined 48 1974-03-29 8:29 43.0 Not Determined 49 1974-05-03 9:31 105.0 Not Determined 50 1974-06-07 12:05 195.0 Not Determined 51 1974-07-02 9:00 108.0 Not Determined 52 1974-08-05 10:45 80.4 Not Determined 53 1974-09-05 12:50 8.64 Not Determined 54 1974-10-08 12:50 7.15 Not Determined 55 1974-11-18 9:52 9.78 Not Determined 56 1974-12-30 13:20 5.43 Not Determined 57 1975-01-24 10:00 3.29 Not Determined 58 1975-02-13 13:00 3.0 Not Determined 59 1975-03-25 11:30 26.7 Not Determined 60 1975-04-24 11:15 250.0 Not Determined 61 1975-06-17 9:15 260.0 Not Determined 62 1975-07-02 12:05 625.0 Not Determined 63 1975-07-17 13:20 313.0 Not Determined 64 1975-08-20 10:30 142.0 Not Determined 65 1975-09-22 12:50 105.0 Not Determined 66 1975-10-21 12:00 52.2 Not Determined 67 1975-11-17 9:00 44.0 Not Determined 68 1975-12-18 9:40 38.1 Not Determined 69 1976-01-22 9:45 16.8 Not Determined 70 1976-02-24 9:00 45.9 Not Determined 71 1976-03-19 11:30 114.0 Not Determined 72 1976-04-23 8:40 195.0 Not Determined 73 1976-05-11 9:15 77.3 Not Determined 74 1976-06-14 Not Available 12.3 Not Determined 75 1976-07-28 14:00 9.32 Not Determined 76 1976-08-16 8:45 2.28 Not Determined 77 1976-09-21 11:30 0.78 Not Determined 78 1976-10-15 9:15 0.53 Not Determined 79 1976-11-19 7:45 2.13 Not Determined 80 1976-12-21 11:00 1.53 Not Determined 81 2006-11-17 14:20 13.3 Yes Notes: 1 Regulation includes human influences on streamflow from causes such as hydropower, reservoirs, water supplies, or wastewater discharges. 2 Base flow is defined as a period of at least 10-14 days without precipitation that produces detectable runoff.