05243720 - STRAIGHT RIVER AT OSAGE, MN Streamflow potentially affected by regulation1 - No Location.-- latitude 46o55'14" longtitude 95o15'08" Measure number Date Time Discharge, in ft^3;/s Base Flow2 1B 1974-10-02 11:40 16.8 Not Determined 1C 1975-07-30 8:25 22.2 Not Determined 1D 1975-10-15 Not Available 27.1 Not Determined 1E 1976-06-01 Not Available 23.9 Not Determined 1F 1976-09-09 Not Available 16.2 Not Determined 1G 1984-08-16 16:30 14.5 Not Determined 1 1986-09-23 Not Available 44.8 Not Determined 2 1986-11-06 7:55 35.2 Not Determined 3 1987-03-12 8:05 30.4 Not Determined 4 1987-04-14 13:55 29.8 Not Determined 5 1987-04-27 10:15 27.4 Not Determined 6 1987-06-09 12:10 25.8 Not Determined 7 1987-07-16 7:40 22.5 Not Determined 8 1987-08-06 11:00 25.4 Not Determined 9 1987-08-27 8:00 25.0 Not Determined 10 1987-10-20 8:50 26.5 Not Determined 11 1987-11-12 7:25 27.4 Not Determined 12 1987-12-14 12:50 26.6 Not Determined 12A 1988-01-04 10:10 22.7 Not Determined 13 1988-01-13 7:45 27.4 Not Determined 14 1988-02-10 12:20 23.9 Not Determined 15 1988-03-24 7:50 29.1 Not Determined 16 1988-04-21 9:10 25.9 Not Determined 17 1988-05-04 15:10 26.4 Not Determined 18 1988-05-05 8:10 22.4 Not Determined 19 1988-06-07 12:00 21.4 Not Determined 20 1988-06-29 13:35 12.1 Not Determined 21 1988-07-21 7:00 15.6 Not Determined 22 1988-08-02 13:15 31.2 Not Determined 23 1988-08-25 Not Available 13.7 Not Determined 24 1988-09-06 13:15 17.6 Not Determined 25 1988-10-19 17:15 20.0 Not Determined 26 1988-12-01 8:05 25.4 Not Determined 28 1989-02-15 15:50 21.2 Not Determined 29 1989-03-28 8:00 29.4 Not Determined 30 1989-05-02 8:50 33.4 Not Determined 31 1989-06-01 8:40 27.0 Not Determined 32 1989-06-28 11:50 24.2 Not Determined 33 1989-07-25 15:00 14.3 Not Determined 34 1989-09-14 7:30 20.1 Not Determined 36 1989-12-13 15:10 19.6 Not Determined 37 1990-01-18 10:50 22.2 Not Determined 38 1990-01-30 9:45 20.0 Not Determined Notes: 1 Regulation includes human influences on streamflow from causes such as hydropower, reservoirs, water supplies, or wastewater discharges. 2 Base flow is defined as a period of at least 10-14 days without precipitation that produces detectable runoff.