05131310 - BEAR RIVER NEAR TOGO, MN Streamflow potentially affected by regulation1 - No Location.-- latitude 47o49'20" longtitude 93o03'04" Measure number Date Time Discharge, in ft^3;/s Base Flow2 1 1970-07-30 Not Available 20.3 Not Determined 2 1970-08-11 Not Available 22.5 No 3 1970-09-29 Not Available 18.1 Not Determined 4 1971-08-05 14:20 23.1 Yes 5 1971-09-07 12:00 27.1 Yes 6 1971-09-15 14:50 21.4 Yes 7 1972-06-06 16:25 71.5 Not Determined 8 1972-09-12 14:30 66.3 Not Determined 9 1972-10-17 Not Available 68.6 No 10 1973-09-21 Not Available 40.2 No 11 1975-08-15 14:50 19.5 Not Determined 12 1976-06-02 13:35 21.9 Not Determined 13 1976-08-16 11:30 18.9 Not Determined 14 1976-09-16 11:30 12.7 Yes 15 1980-05-13 11:50 59.0 Not Determined Notes: 1 Regulation includes human influences on streamflow from causes such as hydropower, reservoirs, water supplies, or wastewater discharges. 2 Base flow is defined as a period of at least 10-14 days without precipitation that produces detectable runoff.