04024095 - NEMADJI RIVER NEAR HOLYOKE, MN Streamflow potentially affected by regulation1 - No Location.-- latitude 46o31'04" longtitude 92o23'22" Measure number Date Time Discharge, in ft^3;/s Base Flow2 1 1970-08-11 Not Available 22.5 No 2 1971-09-23 8:00 31.0 Yes 3 1972-11-15 Not Available 78.0 No 4 1973-03-29 11:30 261.0 Yes 5 1973-06-05 13:30 159.0 Yes 6 1973-08-17 9:00 132.0 Yes 7 1973-09-18 Not Available 35.8 No 8 1973-10-25 14:30 75.5 Yes 9 1974-04-16 11:35 527.0 Yes 10 1974-05-13 12:00 340.0 Yes 11 1974-06-27 9:45 35.1 Yes 12 1974-07-03 12:40 45.8 Yes 13 1974-07-31 11:20 26.8 Yes 14 1974-08-05 14:30 224.0 Yes 15 1974-09-19 9:05 28.1 Yes 16 1974-09-24 Not Available 24.5 Not Determined 17 1974-11-07 Not Available 81.2 Not Determined 18 1975-04-15 Not Available 433.0 Not Determined 19 1975-04-17 Not Available 681.0 Not Determined 20 1975-04-21 Not Available 888.0 Not Determined 21 1975-04-24 Not Available 1070.0 Not Determined 22 1975-04-29 Not Available 1050.0 Not Determined 23 1975-08-21 Not Available 20.1 Not Determined 23A 1975-10-07 17:45 21.1 Yes 23B 1976-06-03 9:45 23.2 Yes 23C 1976-08-31 16:30 14.1 Yes 24 1979-04-20 Not Available 1790.0 Not Determined 25 1984-05-08 14:36 241.0 Yes 26 1985-07-17 9:10 30.3 Not Determined 27 1985-09-03 11:15 2120.0 Not Determined 28 1986-08-21 10:25 290.0 Not Determined 30 1989-08-31 14:00 528.0 Not Determined 31 1990-03-28 14:16 66.9 Not Determined 34 1993-06-24 Not Available 922.0 Not Determined 35 1995-03-30 12:20 202.0 Not Determined 36 1995-10-26 9:20 333.0 Not Determined 37 1996-04-12 15:30 732.0 Not Determined 38 1996-04-18 10:45 1180.0 Not Determined 39 1997-04-04 9:00 910.0 Not Determined 40 1998-03-30 14:35 387.0 Not Determined 41 1998-06-04 15:10 243.0 Not Determined 42 1999-03-31 11:25 381.0 No 43 1999-07-09 12:55 430.0 Not Determined 44 2001-04-12 12:00 1750.0 Not Determined 45 2001-04-23 15:15 3080.0 No 46 2002-04-11 13:35 1080.0 Not Determined 47 2003-03-26 14:55 25.8 Not Determined 48 2004-03-29 15:15 584.0 Not Determined 49 2004-04-05 11:45 334.0 Not Determined 50 2005-04-04 10:43 395.0 Not Determined Notes: 1 Regulation includes human influences on streamflow from causes such as hydropower, reservoirs, water supplies, or wastewater discharges. 2 Base flow is defined as a period of at least 10-14 days without precipitation that produces detectable runoff.